Helm Group

Lock and Dam 15, Mississippi River Major Rehabilitation

This project was a partial refacing of the existing lock with one-sided forms and poured-in-place concrete.  An upper and lower guidewall resurfacing was also included in the work.  As with most winter shutdown lock and dam work, gate repair, electrical ductbank construction, and concrete repairs were also included in the scope.

Lock and Dam 15, Mississippi River Refacing